激光拼焊报错请教
本帖最后由 weixing_hust 于 2010-5-29 08:00 编辑我根据坛子上的激光拼焊的算例做的模拟,材料用自己定义的,结果经常出现错误一,请斑竹和各位Pamstamp前辈指点一二。万分感谢!
------------------------------------------------------------------------------------------------------------------------------
错误类型一:
Error : Cycle = 10814 Progression = 159.265366 (Time = 32.603073)
cycle10815 time step0.3639e-04 imposed by shell 380596 dropped too much
Error : Cycle = 11050 Progression = 159.183517 (Time = 32.586704)
cycle11051 time step0.3983e-04 imposed by shell 436080 dropped too much
------------------------------------------------------------------------------------------------------------------------------
错误类型二:
Auto-Positioning action : Non Uniform Drawbead Autopositioning
Position object(s) : drawbeads
Onto object(s) : Die
Along direction : 0,0,-1
With tolerance : 0--------------------------------------------------------------------------------
Error 120 : Cycle = -1 Progression = 0.000000 (Time = 0.000000)
The positioning action failed due to an internal error Id 721065
No source node found
------------------------------------------------------------------------------------------------------------------------------ 请教还要让我们付钱吗?? 错误类型一貌似是网格畸变了。。试试重新划分板料网格。
错误类型二貌似是拉延筋定位问题,检查下设置。
PS: 以后不要搞收费主题了。别人帮你的话还得先付钱给你。。。 天哪,我只是打开这个帖子,又没有购买主题,怎么扣了我两个成型币? 汗。。同情下LS... 2# kofkiller
实在不好意思,第一次发文,都随便设置的,以为是奖励呢。抱歉。
非常感谢楼主的解答,以后会继续关注这个论坛,向大家多多学习。 4# forxy
不好意思。 你取消了吧,
页:
[1]